Our TEAMS (Technology, Engineering, Art, Maths and Science) facility was completed in September 2017, showcasing Al Siraat’s contemporary way of thinking in regards to important learning environments and student work spaces.
The building provides students with technology-rich, interactive spaces, with a focus on collaboration and individuality. Teaching and learning spaces are based on the concepts of transparency with lots of natural light and large open windows, mobility, adaptability, and student-centeredness. The entire building is technologically advanced with contemporary equipment and a very spacious and atmospheric interior.
This facility has become known as the "green building", is offering our students and staff many amazing destinations, including:
- Science labs
- Ceramics, including pottery wheels and kilns
- Textiles
- Food Technology
- Plastics/Woodwork, including a vacuum press and laser cutter
- Robotics
- Visual Communication and Design
- Dining hall/classrooms
- Breakout spaces and canteen
The TEAMS building often houses our regular school tours, special community events, internal events for Primary and Secondary students like our annual Science, Art & Technology exhibitions, parent workshops and much more.
51³Ô¹ÏÍø is deeply grateful to the Commonwealth Government for contributing $1.725 million towards this building project.